The maturity date on a fix and flip loan is a real date. It is printed on the note you signed, it does not care that your electrician disappeared for three weeks in July, and it does not move because the house is ninety percent done and looks great.

Here is the version that walks through our door about once a month. Twelve month loan, funded in September, 172,000 dollars against a purchase of 134,000 and a sixty-eight thousand dollar rehab. Construction ran long for ordinary reasons: a structural surprise in the rear addition, a two month permit wait on the electrical service upgrade, and a subcontractor who took a bigger job. It is now late August. The house is finished, listed, showing, and there is no contract. Maturity is September 14.

The investor assumes the lender will simply roll it because the loan is well collateralized and no payment has ever been missed. That is roughly half right, and the half that is wrong is expensive.

We are a Pittsburgh-based mortgage brokerage, NMLS #1840537, and we place fix and flip, bridge, and rental loans for real estate investors across Pennsylvania and additional states. This is what actually happens when a short term loan reaches its term, what an extension costs, what makes one get approved or declined, and how to stop needing one.

What maturity means on this product

A fix and flip loan is a balloon. You have been paying interest only, so the balance you owe on the maturity date is the entire drawn principal. There is no amortization quietly retiring it in the background. On the file above, the number due on September 14 is roughly 172,000 dollars plus accrued interest, in one payment.

If it is not paid, the loan is in default. Not delinquent, which is what a missed monthly payment creates. Default, which is a different category with different consequences, and which is triggered by the passage of a date rather than by anything you did or failed to do.

What default unlocks, depending on how your documents are written, is a default interest rate that is typically several points above your note rate and sometimes considerably more, late fees and default charges, the lender’s right to stop funding any remaining draws, and the right to begin foreclosure. Our post on the note and mortgage you actually sign at closing covers where these provisions live in the documents, and this is the moment they stop being boilerplate.

In practice no reasonable lender forecloses on a performing borrower with a finished house on day fifteen. What they do is start charging default interest, and on 172,000 dollars at eighteen percent that is about 2,580 dollars a month against roughly 1,505 at ten and a half. An extra thousand a month for not having asked.

What an extension actually is

An extension is a written amendment moving the maturity date. It is not a favor and not automatic, even when your documents contain an option.

A contractual extension option. Some notes include one or two built in extensions, commonly three or six months each, exercisable if you meet stated conditions. Typical conditions are that the loan is current, that the rehab is complete or substantially complete, that there is no other default, that property taxes and insurance are current, and that you give written notice some number of days before maturity. If your documents have this, read the notice window carefully. Fifteen or thirty days is common, and blowing the notice deadline can forfeit an option you paid for.

A discretionary extension. Everything else. No contractual right, so the lender decides, and the decision is a fresh credit decision on a loan that is by definition not performing to plan.

The difference is leverage. With an option you exercise a right. Without one you ask, and the answer comes with terms attached.

What it costs

Extension pricing varies by capital source and is subject to change, but the shape is consistent enough to plan around.

The extension fee is usually stated in points on the outstanding balance, commonly one half to one point for three months and one to two points for six. On 172,000 dollars, one point is 1,720 dollars, paid when the extension is executed rather than at payoff. A rate bump of half a point to two points is common on discretionary extensions and less common on contractual ones. On 172,000 dollars, a one point increase is about 143 dollars a month.

Then there are the things that quietly come due with the extension: an updated appraisal or a broker price opinion if the valuation is stale, an updated title search or date down endorsement, proof that taxes are current, and confirmation that builders risk extends through the new maturity date. Insurance is the one that bites, because builders risk policies are often written for a fixed term matching the original loan and do not always extend cheaply once the property is finished and vacant. Our post on what happens when a policy lapses covers what a servicer does when coverage falls off.

Add it up on a six month extension of that file: two points at 3,440 dollars, a one point rate bump at roughly 858 dollars over six months, a BPO at four hundred, a title date down at three hundred, and a builders risk extension at six hundred. About 5,600 dollars, plus six more months of interest at roughly 1,647 dollars a month under the new rate, or about 9,880. Call it 15,500 dollars to buy six months.

Against a projected profit of forty thousand, that is a real bite and a survivable one. Against eighteen thousand, it is most of the deal.

What gets an extension approved

The lender is asking one question: is there a clear, dated, believable path to repayment, and does the collateral still cover the balance if there is not? Five things move that answer.

The rehab is genuinely finished. A completed property is a sellable property and a refinanceable one. An eighty percent complete property is a construction risk the lender now owns. If you are going to be late, be late with a finished house. Our post on the final draw and project closeout covers what completion means in the lender’s file, which is not the same as what it means to you.

Payment history is clean. Twelve months of on time interest payments is the single most persuasive thing in the file. It is also the cheapest thing to protect, and investors who are short on cash near the end of a project sometimes skip a payment to fund a punch list. Do not. Borrow the punch list money somewhere else.

There is evidence of a real exit. A listing agreement, showing logs, a price reduction history that shows you are responding to the market, an accepted offer even if it fell through, or a rental loan application in process. Something dated and external. “It should sell soon” is not evidence.

The value still supports the balance. If your loan is 172,000 dollars and the BPO comes back at 265,000, you have a sixty-five percent loan to value and a lender who is comfortable. If the BPO comes back at 195,000 because the market moved or the original ARV was optimistic, you are at eighty-eight percent and the conversation changes. Our post on a flip appraisal coming in below your ARV covers the same problem at origination, and it is worse at maturity because you have fewer moves left.

You asked early. Sixty days out you are a borrower managing a project. Five days out you are a problem. The credit decision is made by people, the file is reviewed in a queue, and both of those facts favor whoever calls first.

What gets one declined

The pattern is consistent. Construction is stalled with no contractor and no plan to restart. Payments have gone late. Value slipped and leverage is high. Mechanics liens have been filed by unpaid subs, which our post on lien waivers explains how to avoid. Or it is the third request on the same loan, at which point the lender has concluded more time is not the missing ingredient.

The other silent killer is a borrower who stopped communicating. Lenders extend loans for people they can reach.

The alternatives to extending

An extension is one of five ways out and it is often not the cheapest.

Refinance into a rental loan. If the property is finished, leased or leasable, and the rent supports a coverage ratio, this is usually the best available outcome. You retire the short term debt entirely, you stop paying construction pricing, and you keep the asset.

Run it on the file. Finished value 265,000 dollars, market rent 1,975 dollars. A rental loan at seventy percent of value is 185,500 dollars, which clears the 172,000 payoff with room for costs. At seven and one-half percent on a thirty year amortization, principal and interest is about 1,297 dollars. Taxes at 3,400 dollars a year are 283 dollars a month. Landlord insurance is 115 dollars. Total payment is roughly 1,695 dollars. Coverage is 1,975 divided by 1,695, or 1.17. That qualifies on most programs, which typically want 1.10 to 1.20 or better.

Note what carried the deal: the rent, not the equity. If the same house rented at 1,700 dollars, coverage would be 1.00 and the refinance would not clear, no matter how much equity you had. This is the calculation to run in month eight, not month twelve. Our deal calculator does the payment side, and our post on refinancing a flip into a rental loan covers the seasoning and documentation questions that come with it.

Refinance into another bridge loan. If the property is not rentable or the ratio does not work, a new short term loan from a different capital source can pay off the maturing one. That costs a full set of closing costs and origination points rather than an extension fee, so it usually only wins when the new loan is materially cheaper or longer, or when the current lender has declined.

Sell it faster. Sometimes the honest answer is that the house is priced ten thousand dollars above the market. Compare the reduction against the all in cost of an extension. On the file above, 15,500 dollars buys six months. A twelve thousand dollar price cut that produces a contract in two weeks is the better trade, and it is not close.

Bring cash to a partial paydown. Lenders will sometimes grant an extension in exchange for a principal reduction that improves their position. Paying down twenty thousand dollars to move leverage from sixty-five to fifty-eight percent can turn a maybe into a yes, and it is cheaper than two points on the full balance.

Take a partner. Rare, and usually a sign of larger problems, but bringing equity in to retire the debt beats a foreclosure on your record. It will cost you most of the profit.

How to not need one

Almost every extension we see traces back to one of four decisions made at origination.

The term was set to the construction schedule instead of the whole cycle. Your schedule is construction. Your loan has to cover construction plus listing plus contract plus closing, and on an entry level house it may also have to cover a buyer seasoning requirement. If the build is four months, the loan should be twelve, not six. The extra interest on the unused months is a rounding error against an extension fee.

The permit timeline was not in the schedule. Permit review is the most underestimated line in every rehab calendar we see, and it is entirely outside your control. Our post on permits as a draw condition covers why this stalls draws as well as schedules.

The budget was thin, so the project stopped when it ran out. A rehab that runs out of money in month seven does not resume in month eight. It resumes whenever you find capital, and that gap is what eats the term. Our posts on material cost overruns and on a contractor walking off mid rehab cover the two most common versions.

Nobody read the extension provision before signing. Know at closing whether you have a contractual option, how many, how long, what they cost, and what the notice window is. That is a five minute read that changes your leverage twelve months later.

The calendar we give clients

Work backward from maturity. At ninety days out, get a realistic value opinion and decide whether the exit is a sale or a hold. At sixty days out, with no accepted contract, open the extension conversation and simultaneously start a rental loan application if the ratio might work. At forty-five days out, order whatever the extension will require, usually a valuation and a title update, because those take weeks. At thirty days out, have the extension executed or the refinance clear to close.

The investors who never pay default interest are not the ones with the best contractors. They are the ones who put the maturity date in their calendar with a ninety day reminder on the day they closed.

How we handle it

When a client calls us about a maturing loan, we do three things in order. We get a current value opinion so the conversation is grounded in a number instead of a hope. We run the rental refinance math, because it is frequently the cheapest exit and it is the one investors skip. And we price the extension against a new bridge loan and against a price reduction, so the choice is made on cost rather than inertia.

Sometimes it is extend. Often it is refinance into a rental loan and stop paying construction pricing on a finished house. All of them beat default interest, and all get easier the earlier they are made. Send us the balance, the current value, the market rent, and the maturity date and we will run all three. If capital for the paydown would come out of equity elsewhere, our post on funding from a HELOC or cash out refinance covers how borrowed money changes the real math.

Extension fees, rate adjustments, valuation requirements, default rates, and program guidelines vary by capital source, loan, borrower, and market, and are subject to change without notice. This is general information for real estate investors, not a loan commitment, a rate quote, legal advice, or tax advice. Figures used above are illustrative.

To talk through a maturing loan, reach out or call 412-990-2941. Our DSCR rental loan page covers the refinance exit, and our rental portfolio page covers the version where several properties come out together.

FMC Capital, NMLS #1840537. This article is general information for real estate investors and is not a loan commitment, a rate quote, or financial advice. Loan terms, pricing, and requirements vary by lender, property, and borrower, and are subject to change. Call 412-990-2941. Equal Housing Opportunity.

Search
Categories
Categories
Request Information